I finished the last post on day13 so here is day 14
My parents got a lot more done they installed all the shelves that will be on the bus, the sink, the bathtub and the boiler that heats those. They cut a hole in the countertop for the sink and the boiler got installed underneath it. Avery and I cleaned the top of the bus it was so dirty because of the chestnut tree above it. In this Tik Tok, you can see my parents installing one of the cubert doors which is made out of plexiglass.
Here is a bus tour there is not much more done from the last video. We got the rest of the stuff for the bathtub in like the faucet and the showerhead. So here is the Tik Tok
Avery and I started to paint the bus with an outside metal paint we picked a fairly bright color but I think it is a good color choice. We used brushes and rollers and we decided to paint the whole bus at first we wore just going to paint the sides and back because that was all we sanded but the paint we got sticks to the glossy paint.
In this next video, I will show you a tour of the bus. We have installed everything in the bus now and the fireplace was installed.
Here is part two of the bus tour.
This is all the videos I have of the bus so far.
Comments